In 1999, Mike and crew
hauled the "Porpoise" onto the boat ramp, blocked it up, re-fiber
glassed the boat and painted it. By the time we returned in March 2000,
the salt water had taken its toll on the paint.
Top Left: March 2000
Bottom Left: Low Tide, March 2000
Right: March 18, 2000 - The first visible project is the
stainless steel exhaust system Mike installed.
|